Tekno Endüstri GES

Tekno Endustri GES – self consumption model rooftop Project - is located in Ankara. Plant has a total capacity of 819 kWp with an estimated annual energy production of roughy 1.130.100 kWh, avoiding the emission of over 1670 tons of CO2 per year and saving 690 trees per year. Project was completed on February 2016.
Location Ankara
Assembly Type Çatı
Field (m2) 5.250
Situated Power 819
Yearly Expected Production Amount ( kWh)  1,130,100
Blocked CO2 Amount ( tonne) 690
Recovered Tree Amount(unit)  1,670
PV Module Brand and Power Yingli Solar YL 255 P - 29b
PV Module Amount 3213
Inverter Brand ABB Trio 27,6 kW
Inverter Amount  24
Construction Duration 1 ay
Activation Date  2016

 

Facebook
Google+
https://www.teknoraysolar.com.tr/en/tekno-endustri-solar-energy-system
YouTube
LinkedIn
For more information

You can get in touch by calling +90 216 577 63 00



Follow us on Social Media!

Subscribe to new updates!

We will let you know about the latest news!


I want to sign up



İLETİŞİME GEÇİN

X
İLETİŞİME GEÇİN