Kirteks GES – self consumption model rooftop Project - is located on in Kahramanmaras. Plant has a total capacity of 500 kWp with an estimated annual energy production of roughy 632.650 kWh, avoiding the emission of over 383 tons of CO2 per year and saving 927 trees per year. Project was completed on December 2013.
Location | Kahramanmaraş |
Assembly Type | Çatı |
Field (m2) | 7500 |
Situated Power | 500 |
Yearly Expected Production Amount ( kWh) | 632650 |
Blocked CO2 Amount ( tonne) | 383 |
Recovered Tree Amount(unit) | 927 |
PV Module Brand and Power | Yingli Solar YL 250 P - 29b |
PV Module Amount | 2000 |
Inverter Brand | SMA Sunny Tripower 20000TL |
Inverter Amount | 22 |
Construction Duration | 1 ay |
Activation Date | Ara. 13 |