Çallıca GES

Callica SPP located in Burdur has a total capacity of 6.600 kWp with an estimated annual energy production of roughy 11.107.800 kWh, avoiding the emission of over 6.786 tons of CO2 per year and saving 16,415 trees per year. Plant will be installed on the area of 125.000 m2. The construction of the solar farm was started at the beginning of 2016. The grid connection is expected on 2016.
Location Burdur
Assembly Type  Zemin
Field (m2) 125.000
Situated Power 6.600
Yearly Expected Production Amount ( kWh) 11.107.800
Blocked CO2 Amount ( tonne) 6.786
Recovered Tree Amount(unit) 16.415
PV Module Brand and Power Yingli Solar YL 255 P - 29b
PV Module Amount 24445
Inverter Brand SMA CP XT 1000
Inverter Amount 6
Construction Duration  6 ay
Activation Date 2016
For more information

You can get in touch by calling +90 216 577 63 00



Follow us on Social Media!

Subscribe to new updates!

We will let you know about the latest news!


I want to sign up